Advice 1: What documents are needed for a building permit for individual housing construction

"Permission for construction of individual houses (IH)" - the official document authorizing the owner of a land plot to erect on it a building whose specifications given in this document. The house, built in accordance with the received resolution can then be a legitimate way to commissioning and issue ownership.
What documents are needed for a building permit for individual housing construction
Instruction
1
Until March 1, 2015 to certificate of ownership for individual housing construction is possible in a simplified manner even under the current law, which is popularly called "dacha Amnesty". According to this law, to become the owner of the house is already built you can without officially received the construction permit. However, in this case, you will need it when you are going to take loans to build a house in the Bank or to connect the already built housing to the gas communication. In any case, before the expiration of the "dacha Amnesty" individual house is already build, you're unlikely to have time, so the building permit will need to obtain in the prescribed manner.
2
This document, in accordance with article 51 of the town planning code of the Russian Federation, issued by bodies of local self-government. To obtain permission for the construction of an individual house, you will need the following documents:
- the statement addressed to the head of the local administration;
- passport details of the developer;
- title documents to the land plot;
- urban development plan;
- the scheme of planning organization of land plot, which shows the boundaries and marked the location of object of individual housing construction.
3
The title is the document on which you are considered the owner of this site – the certificate or the certificate of ownership. The production of the urban plan, you must order by the territorial body of architecture and urban planning at the location of the site. In accordance with paragraph 10 of article 51 of the urban planning code, is not allowed to require from the developer additional documents not stipulated by law.
4
Once the application and required documents submitted, the building permit must be issued within 10 working days. During this time, the Supervisory authorities will check compliance of the scheme actual placement of the structure to the requirements of the urban development plan and approved by the red lines, if implemented, you will receive a positive decision. When the decision is negative, you have the right to challenge it in court.
Note
Permission for construction of individual residential houses shall be issued for a period of 10 years.
Useful advice
In accordance with the town planning code of the Russian Federation, part 3 of article 48, for permission to build a house designed for one family, the height of which does not exceed 3 storeys, the project documentation is not required.

Advice 2 : How to obtain consent for the construction

The consent of neighbors in the construction of the necessary only if the distance between the houses does not meet the standards of construction and fire safety, as well as if you built the house or on the construction site are co-owners. During the reconstruction of apartments in an apartment building, you need the consent of 67% of the owners. It can be obtained personally from all the owners, and the method of absentee voting.
How to obtain consent for the construction
You will need
  • -passport
  • -statement
  • -evidence of ownership of the building and on the site
  • -extract from the cadastral passport of the house and land
  • -written consent from neighbours if building codes sites are too close
  • -house design and engineering communications
  • -resolution of the head of administration and head of municipal services of the district
Instruction
1
For documents on the construction contact to the General Directorate of architecture and urban planning. Imagine all the documents on the site on the structure.
2
Having considered your application, and after reviewing the plot plan that you have made, the surveyors, the chief architect will decide, you need to take permission from the neighbors or not. This decision is made on the basis of topographic areas, where all the neighboring houses, plots and the passage of the "red line" of the street.
3
If building codes the distance between the plots does not correspond to position, it will tell you to take permission for the construction from neighbors from all areas that are too close.
4
The solution can be written in a simple written form. It specifies the address of neighbors, their details, and their consent to the construction. In addition, it lists your details, address and the number of storeys of the structure, which you are going to build. Only after obtaining permission from neighbors you will sign all documents the head of the local administration.
5
Then you need to seek resolution in a municipal service district.
6
After collecting all the documents, project construction and project engineering services, you will receive permission from the chief architect and construction certificate.
7
If your land there are co-owners, the consent must be obtained from all co-owners.
8
If you are going to attach the house, which is owned by a few families and are co-owners, you need to obtain the consent of all co-owners.
9
The reconstruction of an apartment in a building also need the consent of all co-owners. You will be given a permit with all necessary documents and the consent of more than 67% of all residents.

Advice 3 : You need to build a house

According to the statistical surveys of Russia's population, over 70% of respondents prefer to live in a private home. Most of them would like to build a house for his family on his own project, which would be consistent with their individual wishes and needs.
You need to build a house
Construction of private homes is a complicated, expensive, but at the same time extremely exciting process. Before the construction of the house, you have a long way to go, because the house is not only walls, but also site selection, preparation of documents, creation of project, a cost calculation. And only after all these preliminary works, you are ready to buy building material and the construction.

What documents do I need to build a house



After the selection of a site for construction of a private house it is necessary to issue the relevant documents on it and to obtain permission to build on it.

The right of possession of land defines a contract of sale or order of administration of the settlement on its allocation to a private person, passport section with its detailed plan, address and description of features.

After obtaining a building permit you can begin to create a building project. Doing this usually specialist companies, whose employees are in the design take into account the characteristics of the soil, its location, climatic conditions of the region. In addition, they will provide the necessary guidance on the choice of construction materials that will last as long as possible in this region, and estimate of construction.

After approval of the project house in the administration of the settlement should be to permit communications to the site. After all, without the availability of water and electricity to perform work is uncomfortable and difficult, and the construction will take a very long time.

What materials are needed to build a house



For construction of residential house will need a huge amount of different building materials. Certain materials are better to buy in stages, as during the execution of the works subject to adjustments in the project, and some of them may not be suitable for some parameters.

In the first phase of construction acquired the basic material, some of which will be erected the walls of a building, for example, a wooden block, brick or concrete panels. In addition, before construction of the walls will need to prepare the ground for them – a Foundation. Will need a heater, and means for pre-finishing of walls and materials to protect them from exposure to the environment.

The second phase of construction – the construction of the roof. Would need the rafters and roofing material. After the end is erected a roof, start vysilani sexes.

To conduct communications required of the pipe corresponding to the type of supply for water or katopodi. For electricity and telephone lines necessary wooden supports and cable.

And only on the fourth and fifth stages starts the external and internal decoration of the house. The choice of materials depends on the type of interior, and their estimated cost, from the willingness and financial capabilities of the owner.