Instruction
1
Break the process of execution of the workss the sequence of process steps, each of which can represent a set of certain types of work. Calculate the required volumes of materials and works based on the composition and quantity of basic resources, geographical specificity of the area of work. Determine at the time the need for labour and material-technical resources, delivery of all types of equipment and leading mechanisms.
2
Use this baseline data as the norms of duration of construction, which shall be determined in accordance with the approved documentation, policy work and the construction regulations, as well as working drawings and estimates. Collect and analyze data on contractors and participants in the execution of works: security personnel at the main relevant disciplines, the use of the team contract, the production and technological equipment. Note the need for transportation of construction materials, gather data about existing mechanisms and opportunities for the acquisition and supply of necessary materials and other resources.
3
Make a list (nomenclature) of ongoing works and determine their volumes, select the methods of production of major works and leading machines. Calculate regulatory engineering and complexity, determine the composition of the brigades and units. Install the technological sequence of works and their shifts. Determine the duration of the works and their combination, adjust the number of workers and shifts, comparing the calculated duration with the regulations. Timeworksthe AIT schedule of requirements in material resources. If you have the routing, make a reference to the local conditions.
4
On the basis of available information to determine the timing of production work and in all process stages. Plan schedule , make the calculation and graphical part, which will allow to more clearly monitor its implementation. The graphical part can be represented by a graphω Ganta, a sequence diagram or a network.