Instruction
1
The Foundation for the bath of the lumber is better to make a tape and raised above the ground. Make marks, dig a pit, place the formwork and pour the Foundation. To make the Foundation plinth of 2-3 rows of red brick. After the pouring of the Foundation walls install in a month. Such a period is the Foundation for gaining the final fortress.
2
The lumber for the bath, you must take a quality, dry and smooth. Inspect the timber for the presence of fungus or beetle woodworm. Your timber for the construction of baths is not necessary.
3
Before installing the walls on the Foundation need to secure the waterproofing layer and then lay the lumber. For the first row, take the highest quality timber. At the ends of the beams make.. This is necessary for further connection of the timber. To connect the beam between the need for special brackets. The lower ranks of the antiseptic or lubricating oil. This will protect the timber from rotting. For notching beams to mark, to saw through to half of the markup across, and then lengthwise. By marking and slots of the first series will make cuts on all the others.
4
Stacking the rows of timber in the wall, check the evenness of putting some level. Between each row lay the insulation. Better if it is a tow. Foam is not as durable, and fill her slit much safer than a tow. Can use modern forms of insulation, which are represented in a wide range of building supermarkets.
5
Once you've built the walls, the timber should stand and fall. Only after this cut, the doors and Windows beforehand, mark. Cut out all at once, and putting the Windows and doors, they can move and warp.
6
Make the roof on your project.
7
Then the bath should be insulated. Obtyanite the Foundation materials. Inside the baths and at the intersection of the ceiling and the roof abbate all heat and water insulation materials. This will allow for the change in temperature to protect the timber from moisture.