You will need
  • roulette;
  • - electroporator with a drill 12 mm;
  • - plumbing tool;
  • - tools;
  • - the required fittings (tees, valves, dielectric couplings, etc.) to connect the boiler to the cold and hot water supply and sanitation;
  • - attachment (hooks 8 mm) and plastic dowels 12 mm (in the case of through drilling the threaded hook of required length, nuts and wide washers).
Instruction
1
Select the installation location of the boiler – wall design to withstand the weight of the waterheater. In addition, there should be enough space for the installation of the boiler.
2
Determine whether there is a possibility to connect the boiler to the water supply, sewage and electricity to the selected location. Evaluate the possibility of draining water in drains through the relief valve excess pressure.
3
Consider options for the laying of pipes and cables necessary for the installation of the boiler. Consider the number of plumbing fixtures to be connected to the boiler.
4
Complete all work on the eyeliner communications to the boiler. To connect the electricity, directly in front of the boiler should be provided for the circuit breaker. To avoid overloading the wiring, the mains cable is better to get to the electrical panel.
5
Drill a hole in a brick or concrete wall for a hook, which is the most problematic. Drilling depth length of the dowel or 5 mm deeper. Drive a dowel and a screw hook. If the wall is not brick or concrete, there is the option of fastening through-threaded hooks through the wall. Wall concubine not designed for such loads is plaster reinforced construction built in the capital during construction (bathrooms in many apartment buildings). Therefore, holes are drilled through the partition concubine in concrete or brick main wall. The same applies to the walls, lined with plasterboard or Board.
6
Hang it on a hook screwed into the boiler – it can easily withstand weight up to 200 kg.
7
Align on the wall to the water heater and mark the places of drilling remaining mounting holes. Remove the boiler and drill all the marked holes.
8
Screw on the opening of the pipe not more than 4 turns the safety valve against excess pressure (to cheat more, it stops working). If necessary (cold water meter) – set before the opening of the nozzle strainer.
9
Connect the boiler to the water supply using a dielectric coupling and valves (if a single boiler – the valve need only cold water). To install the valve directly on the safety valve is not recommended.
10
Connect the boiler to the mains.