Calculate the volume of works in construction. Today it is the largest amount. Review of project materials and place them in a convenient order for quick search. Divide the documentation into groups separately for underground and surface.
2
Calculate the volumes of work in a specific order: first count for openings in the outer walls, then to internal, then the work of the walls, the Foundation, any earthworks, floors, all ceilings, roof, staircases, balconies, various overhangs and porch. Proceed to the estimates of works internal and external decoration.
3
Use the specifications on the various materials used: concrete, wood, electrical, etc. in Other words, determine the rate of flow in appropriate units: cubic metres, square, linear, etc.
4
Calculate each of the works on the basis of the market value of one unit. For example, painting one square meter or strip per meter of cable. Consider the imposition of double and triple layers when working with finishing materials.
5
Calculate the volume of construction works by using special computer programs, for example, CADWizard that clearly and accurately make an estimate. Select a drawing, select it and the program will count the entire amount of work in this area. Set real scale, putting only the value of one element of the drawing, for example, walls.
6
Calculate the amount of mechanical work not related to construction. Here, everything is easier. Select the basis for any piece of work (volume). Take it as a unit, for example, loading and unloading of one machine, the number pasted up leaflets, the production of one part, etc. Guide the count of such units, where the work is completely done.
7
Determine the amount of mental work. First, clearly set goals, as detailed as possible. Then at the end of the allotted time, go through the points whose objectives are fulfilled. Determine the percentage amount of work performed to the task. Please note that some items may be more labor-intensive, and therefore require more time.