1. Removal of old materials
The primary task in this case is to get rid of those floor coverings, which previously repaired. Also, you often need to remove the worn cracked coupler that is located under them. From dirt and various debris also need to get rid of before proceeding to further measures.
2. Waterproofing and leveling the floor
Depending on which room is undergoing renovation, selected a further method of decorating the floor. If we are talking about the bathroom or the kitchen, you first need to carry out waterproofing. Floor or treated with waterproofing composition of penetrating, or simply served thick polyethylene film. But the first option is better because it allows to align the surface in the future the simplest way.
Without leveling most floor coverings to be laid is impossible. Therefore, the floor definitely filled with new screed. The cheapest form of screed – cement-sand. But for those owners who want to do less effort, appropriate to the method, when applied self-levelling screed composition. Moreover, it dries faster.
3. Laying of the substrate
Some finishing materials requires additional substrate. For example, if you plan to lay laminate, parquet or linoleum, it is better to cover the screed at least ordinary sheets of plywood. Between them, however, will remain small gaps. They also need zashpatlevat, to the material then turned to lay smoother.
4. The installation finish
Finally, after all this work you can start laying the flooring materials. If he will stick to the surface, the latter is pre-treated with primer. But the installation of the material glueless method allows to refuse from this operation. In the result, the floor will work out reliable and aesthetic. This procedure allows to achieve excellent results in almost all cases.