Advice 1: How to make override

Override is a special kind of estimates, which contains information about executed works. It is calculated the percentage ratio between the volume of work performed and the full scope of throughout the estimate. The procedure for filing and completing the override is determined by the Resolution of Goskomstat of the Russian Federation No. 71A from 31.10.1997.
How to make override
Instruction
1
Use to compile override the acts of the executed works accounting forms KS-2, KS-3, and in some cases KS-6A, as well as the forms provided by the contractor.
2
Apply before the override information, which contains information about the written off materials expended in the performance of works. It should also be noted what equipment was installed at the facility, and to provide copies of documents of installed equipment. Sometimes it so happens that the contractor attempts to inflate the amount so you should carefully check all the supporting documents.
3
Start preparing for the compilation of the override for a few weeks before the deadline, ideally start to work on it immediately after the signing the previous one. Make a plan and projects that need to be performed in the current reporting period to prepare the source data.
4
Visit the facility, check the current status of the work. Remember that for incorrect statements lay the blame on you, not the superintendent or the superintendent. Collect a complete and adequate basis for the compilation of the override.
5
Fill in the required customer and contractor forms to override. For the cost estimates or make the distribution of information on volumes of close work. Show the amount of work the technical supervision, which should be representative for the object and indicate the points that are specified in the override. Will receive from tüv confirmation of a writ of execution of these volumes.
6
Close all orders. Tell the contractor the certificate obtained in the technical supervision of performed works, which confirms the data override. The last step will be reporting to the customer. It is necessary to fully prove the amount of work done, otherwise he may refuse to sign written override.

Advice 2: How to sign certificate of completion

The act of executed works is not only a document confirming the fact of fulfilment by the parties of their Treaty obligations, but also used as a primary accounting document whose data is recorded in the accounting records. To accountants and lawyers of all parties to the transaction used to feel safe, you must know how to properly prepare and sign the certificate of the executed works.
How to sign certificate of completion
Instruction
1
Signing the act of executed works the parties agree that all of the workyou produced in full, with due quality and within the specified period. Therefore, before signing the certificate, you must ensure that all conditions are in fact implemented and not kept only on paper.
2
In the act of executed works shall be clearly indicated all the data, which can be easily identified, by whom, when, for whom and on what basis was carried out worksyou. That is, the document must be assigned a number. Also, the instrument should contain a reference to the main contract.
3
The number of copies of the act of the performed works is determined by the number of parties under the main contract. Each side must have a copy.
4
Due to the fact that the tax authorities pay the most attention to the actual date of signing the act of executed works, not the creation date of the document, you should make sure that the date in the act is spelled correctly, accurately and legibly.
5
The act shall contain information about the names of organizations that signed it, as well as the volume and terms of performed works, their cost including VAT. The act of performed works should be signed by the persons authorized to do so, and necessarily sealed.
6
The act can be made, additional documents (e.g. a claim) in cases when one of the parties is satisfied with the completed workAMI not in full, has claims or comments. Usually such cases are specified in advance by the terms of the contract.
7
The signing of the act of the performed works may unilaterally, when one of the parties refuses to sign the act, and the other side believes such refusal is unjustified. In this case, involved the Commission, consisting of specialists, who certify the fact of execution of all works in the proper form.

Advice 3: How to make a CV superintendent

Superintendent means "manufacturer." This is a very popular construction profession, and even despite the crisis, to remain without work good, competent and experienced superintendent is not threatened. But, in any case, a correctly formatted summary will increase your chances of finding a stable and paying job.
How to make a CV superintendent
Instruction
1
Before you make summary the superintendentread General rules of design and drafting. Consider these requirements when preparing your summary.
2
One of the main requirements of the superintendentm in employment, is not so much the experience as special education. It confirms the presence of the diploma of completion of technical school or Institute. Even if you have no experience as a superintendent, but there is such a diploma, still don't give up on writing a summary and their claims to this place. Often the employer offers work to the graduate six months the master and then switches it at the end of summary position.
3
An important place in summary the superintendent is the description of the experience. This section, for the convenience of employees HR, write in reverse order. Starting with your last job. For each of them specify the time and occupied in this period the position. List your job responsibilities.
4
In addition to the standard: inspection of working documentation, preparation of applications for construction materials, development of production schedules of construction works, monitoring their progress and quality, specify additional duties that will be demanded in the prestigious construction companies. These include participation in and visiting of exhibitions and conferences on modern building materials and technologies.
5
Information about their personal qualities, select those that you want to have a good foreman: the ability to resolve conflicts, to make decisions independently, persistence in achieving goals, ability to self-education and taking responsibility for themselves. These qualities are necessary to any Manager, who is foreman in nature.
6
If you know how to use a computer and special software, know foreign languages, be sure to include it in your summary. This is an extra plus.
7
The volume of the summary should be small, the text itself is simple and straightforward. Even if your work is connected with the construction, do not neglect spelling and check summary for grammatical and stylistic errors before sending it.